The demolition of an entire old locker room area
Full subflooring leveled
Two newly constructed locker rooms each with (2) ADA bathrooms
(1) New storage room
(1) Full ADA shower and toilet
Entire full MEP in all areas
All areas received new tile flooring, new walls tiles, lockers, benches, high grade plumbing fixtures and electrical fixtures